Skip to content

Manufacturing

Bills of materials and production orders

Bills of materials set a standard unit cost, and production orders move the stock and post their cost

Sample figures from an example company. It is not a real business. The company name and logo in the pictures are an example. Your company's own name and logo appear in their place.

What changes for you

  • A standard cost for every product

    List the parts with their scrap, the labour hours and the overhead rate. Sysai ERP adds them up to a standard cost for one unit, even when a part is made from other parts.

  • Production orders that move the stock

    Issue the materials and they leave stock at their cost. Report what you made and the finished goods go into stock at the standard cost.

  • Variance by materials, labour and overhead

    When you close the order, the difference from standard is split into materials, labour and overhead, and posts to cost of goods sold.

How it works

  1. 1

    Write the bill of materials: the parts, the labour hours and the rates

  2. 2

    Plan a production order and issue the materials from the warehouse

  3. 3

    Report the finished goods, then close the order to post the variance

Everything in manufacturing

  • Bills of materials with scrap per component
  • Parts made from other parts, up to 20 levels deep
  • Labour hours with a labour rate and an overhead rate an hour
  • A standard cost per unit, showing where each part's cost came from
  • One default bill of materials for each product
  • Production orders: planned, in progress, completed, closed
  • Orders for the parts that are short, planned with the main order
  • The materials list with what is on hand and what is short
  • Issue all the materials at once, or chosen lines and quantities
  • Return unused materials at the cost they were issued at
  • Report output with scrap, hours worked, batch, expiry date and serial numbers
  • Output can never run ahead of the materials issued
  • The variance split into materials, labour and overhead
  • Your own accounts for labour and overhead absorbed
  • Cancel a planned order while nothing has been issued

See Sysai ERP on the example company

Tell us what you need and we reply by email to arrange a demo